五层2500平米南京某实验楼框架设计(含结构图,施工组织)
五层2500平米南京某实验楼框架设计(含结构图,施工组织)(外文翻译,论文计算书19000字,施工组织设计20000字,CAD施工平面图1张,CAD结构图9张,横道图)
摘 要
本工程是南京某中学图书楼楼,为多层钢筋混凝土框架结构,共五层,底层层高 3.6米,其它层层高为 3.8 米。在遵循“适用、安全、经济、美观”的设计原则和国家有关现行建筑结构设计规范与标准的基础上,进行了实验楼的建筑与结构初步设计,获得了该建筑物初步设计阶段的建筑 CAD 设计图纸与技术指标, 确定了结构布置方案与结构计算模型。先进行了层间荷载代表值的计算,然后按底部剪力法计算水平地震荷载作用下大小,进而求出在水平荷载作用下的结构内力(弯矩、剪力、轴力)。接着计算竖向荷载(恒载、活荷载以及雪荷载)作用下的结构内力,找出最不利的一组或几组内力组合。 选取最安全的结果计算配筋并绘图。此外还进行了结构方案中的室内楼梯的设计(完成了平台板,梯段板, 平台梁等构件的内力和配筋计算) 、 楼盖的设计 (完成了板的配筋和次梁的配筋) 、基础的设计(完成了基础的配筋)
关键词: 钢筋混凝土 框架 结构设计
The library building design of a high school of Nanjing
Abstract
This is a library building of a school in NanJing. It is a multi-layer reinforced concrete frame. Ithas five stories, the height of the first storey is 3.6meters, and the height of other stories are 3.8 meters. Inaccordance with the design principle of “applicability、safety、economy、aesthetic”and the present codes and standards of the architectural and structural design, the primary architectural and structural design of building is carried out. After getting the architectural drawing from CAD design, the another decides the structural scheme and the structural calculation model When the directions of the frames is determined, firstly the weight of each floor is calculated . Then making the amount of the horizontal seismic force can be got by way of the bottom-shear force method. The seismic force can be assigned according to the shearing stiffness of the frames of the different axis. Then the internal force (bending moment, shearing force, axial force &snow force) in the structure under the horizontal loads can be easily calculated. After the determination of the internal force under the dead and live loads, the combination of internal force can be made by using the Excel software, whose purpose is to find one or several sets of the most adverse internal force of the wall limbs and the coterminous girders, which will be the basis of protracting the reinforcing drawings of the components. The design of the stairs is also be approached by calculating the internal force and reinforcing such components as landing slab, step board.The design of floorslab is also be completed in the end. [来源:http://www.doc163.com]
Key Words: Reinforced concrete; Frame; The design of the structure
[资料来源:https://www.doc163.com]
目录
第一章 结构选型与布置••••••••••••••••••5
第二章 确定计算简图•••••••••••••••••••6
第三章 框架内力计算•••••••••••••••••••22
第四章 框架内力组合•••••••••••••••••••48
第五章 框架梁柱界面设计•••••••••••••••••58
第六章 楼梯结构设计•••••••••••••••••••78 [资料来源:Doc163.com]
第七章 现浇楼面板设计••••••••••••••••••86
第八章 基础设计•••••••••••••••••••••92
施工组织目录
第一章 工程概况 1
1.1概述 1
1.2工程概况 1
第二章 施工准备工作计划 2
2.1 、生产准备: 2
2.2、技术准备: 2
2.3物资准备 3
2.4施工队伍淮备 3
第三章 施工总体部署 3
3.1施工程序: 3
第四章 施工总平面布置 5
第五章 施工进度安排 5
第六章 主要施工方案 6
6.1基础工程 6 [资料来源:http://doc163.com]
1.土方开挖方法及基础边坡稳定措施 6
2.基础钢筋工程 7
3.基础砼工程施工、模板工程 7
4.基坑回填压实方法、土料选择 9
6.2模板工程 9
6.3钢筋工程 11
6.4混凝土工程 13
6.5砌体工程 15
6.6脚手架工程 17
6.7屋面工程 19
6.7装修工程 23
第七章 主要施工机械设备和材料 26
第八章 劳动力配备计划 28
8.1项目管理人员 28
8.2劳动人员 28
第 九 章 安全文明施工及环境保护措施 30
9.1 安全施工措施 30
9.2 施工现场的环境卫生 30
第十章 季节性施工措施 32
10.1冬季施工: 32
10.2雨季施工: 32