Open Nav

水峪矿300万ta新井设计(采矿工程)

以下是资料介绍,如需要完整的请充值下载.
1.无需注册登录,支付后按照提示操作即可获取该资料.
2.资料以网页介绍的为准,下载后不会有水印.仅供学习参考之用.
   帮助中心
资料介绍:

摘  要
本设计包括三个部分:一般部分、专题部分和翻译部分。66000字
一般部分是水峪矿300万吨新井设计。全篇共分为十章:矿井概述及井田地质特征、井田境界和储量、矿井工作制度、设计生产能力及服务年限、井田开拓、准备方式-采区巷道布置、采煤方法、井下运输、矿井提升与运输、矿井通风与安全和矿井主要经济技术指标。
水峪矿设计年生产能力为300万t/a,服务年限为97年。矿井工作制度为“四六”制。矿井的采煤方法主要为倾斜长壁综合机械化放顶煤开采。矿井开拓方式为双立开拓方式。
矿井布置一个工作面生产,一个工作面备用,年生产能力为300万t/a。工作面长度为250 m。运输大巷采用胶带运煤,大巷辅助运输采用电机车运输材料和矸石。矿井通风方式为中央边界式。
专题部分主要介绍的是综放面顶板顶煤分类及研究。翻译部分题目为“Adopt the crest of the coal work noodles plank management problem study” 。
关键词:综放面、顶煤分类、敏感性指标、夹石层、可放性、稳定性、顶煤相对强度、顶板结构。

ABSTRACT
The design includes three parts : general, thematic elements and some of the translation. Shuiyu part of the general three million tons of ore a new well design. The text is divided into 10 chapters : Overview of mine and mine geology, mine realm and reserves, the system of mine, design and production capabilities and service life, mine development, preparation methods-panel design, mining methods, underground transport, Mine Hoist and transport, mine ventilation and mine safety and the major economic and technical indicators. [资料来源:http://Doc163.com]
Shuiyu mine design annual production capacity of three million, the service life of 97 years. T Mine system "April 6" system. Pit mining methods to tilt fully mechanized longwall top coal caving mining. Mine explore ways to open up two-way up.
Mine production layout of a face, a face standby, the annual production capacity of 300 thousand tons per year. Face length of 250 m. Transportation Roadway belt used to transport coal, Roadway auxiliary transport used motor vehicle transport materials and waste. Mine ventilation system for mixed mode ventilation, mine early central parallel ventilation, the late hybrid ventilation..
Special subject the part is main introductive is a sum up to put the noodles crest the plank crest coal classification and research.Translate parts of topics is"the Adopt the crest of the coal work noodles plank management problem study".
Key words: fully mechanized top-coal caving face caving and drawing characteristics top-coal relative intensity rock parting classification of top-coal stability sensibility target roof structure

[资料来源:Doc163.com]


  [资料来源:http://Doc163.com]

水峪矿300万ta新井设计(采矿工程)
水峪矿300万ta新井设计(采矿工程)
水峪矿300万ta新井设计(采矿工程)
水峪矿300万ta新井设计(采矿工程)
水峪矿300万ta新井设计(采矿工程)

  • 关于资料
    提供的资料属本站所有,真实可靠,确保下载的内容与网页资料介绍一致.
  • 如何下载
    提供下载链接或发送至您的邮箱,资料可重复发送,若未收到请联系客服.
  • 疑难帮助
    下载后提供一定的帮助,收到资料后若有疑难问题,可联系客服提供帮助.
  • 关于服务
    确保下载的资料和介绍一致,如核实与资料介绍不符,可申请售后.
  • 资料仅供参考和学习交流之用,请勿做其他非法用途,转载必究,如有侵犯您的权利或有损您的利益,请联系本站,经查实我们会立即进行修正! 版权所有,严禁转载
    doc163.com Copyright © 2012-2024 苏ICP备2021029856号-4